Bob J. and George applying the caps on the layout box frame. |
Bob O., Bob J. Ken G. Tommy and Cliff finishing up the other side. |
The LED lighting test. |
Cliff and Dave maiking some adjustments. |
|
 |
 |
 |
 |
|
Painting time. Jules and Bob J. working on the trim. |
Jules on the floor trim. |
Sure Jules looks happy now, but after a half hour or so he was done with bending over to paint trim. |
The top half of the wall painted. |
|
 |
 |
 |
 |
|
Ed working on the verticle trim. |
Rob and his son Ben doing trim on the third wall. |
Ben loved the tyvek painting suit. |
After Jimmy finished rolling the main section of the long wall. |
|
 |
 |
 |
 |
|
Getting to the end of the main wall. |
After the finishing the first coat. |
Three walls done, only the window wall to go. |
A nice sky blue for the background around the layout. |
|