Layout Update 11-16-15
  Wiring, water and pilings. October had us starting to wire the layout. Soon we'll be able to run an engine under its own power.
    While one crew was doing the electrical work, another was working on painting the water along the edge of the layout and installing all the pilings and cribbing.
Go back to GSC Home  
Go back to GSC Layout Index  

previous  Index page 1 2  next
Click on a picture to enlarge it.
IMG_1453 IMG_1452 IMG_1454 IMG_1456
Some close-ups of the different pilings and railings.
Looking over the dock at the pilings around the tug and lighter slip.
More pilings. Sorry, we're probably more excited about these than you probably are. There's a lot of busy work that goes into making these and you don't see the payoff of cutting hundreds of 1-1/2 to 2 in dowels and staining them until you install them.
An overhead of the float and apron. The pilings and concrete base are now permanent.
IMG_1457 IMG_1458 IMG_1459 DSCN1747
Cribbing and piling. We've turned into marine structure geeks.
Another piling transition.
Here's what 35 feet of cribbing and pilings look like. The previous shots were not of the same section. It just keeps on going and going and going……
Rich is one of the two people who installed all the pilings.
DSCN1753 102015_movie_still
Here's Rich putting in the individual pilings.
Finally a quick movie from when the mainline track was completed. The train travels 40 foot eastbound, around the 'hidden' return loop then back 40 foot westbound. I'll make another one with an engine after all the wiring is completed.