Layout Update 06-23-16
  After the Open House.
    Here's what the layout looks like after the big push to get it ready for our open house in May.
Go back to GSC Home  
Go back to GSC Layout Index  

previous  Index page 1 2  next
IMG_3308 IMG_3311 IMG_3312 IMG_3313
An overview of the layout. The loop on the bare plywood will eventually be covered by a 2nd level.
The view from the opposite end of the room. This loop on the plywood is temporary and will be replaced when we start phase 2 of the layout.
Looking up Jersey City from the dock area.
The dock and American Scout in the Hudson River.
IMG_3314 IMG_3315 IMG_3316 IMG_3317
Looking over the end of the dumper yard at the Jersey City Terminal and its yard. This is the old temporary terminal building mock-up which is a little larger than the final station will be.
Our old friend the dumper and the pilings for the kick-back track.
The dumper with the coal barge in place. The ramp leading up to the dumper is on the work bench being built.
The Lehigh Valley car float apron and its car float.
IMG_3318 IMG_3320 IMG_3320b IMG_3323
Our mock-up for the howe truss car float apron.
Some of the electronics for Jersey City.
Electronics to run the DCC system, and some of the lighting power supplies.
Electronics to run the DCC system, and some of the lighting power supplies.

previous  Index page 1 2  next
Click on a picture to enlarge it.

Thursday, June 23, 2016
Generated by Galerie