March Update - 3-5-21
  Well, since everything shut down, we haven't posted many pictures. We have been able to go inside
    inside our building and get some work done. Its been slow since only a few are allowed
    in at at time, but we're making progress. This will catch you up with all the Wilkes-Barre changes.
    If you follow our Facebook pages, you may have seen a few of these before.
Go back to GSC Home  
Go back to GSC Layout Index  

previous  Index page 1 2  next
IMG_6659 IMG_6660 IMG_6661 IMG_6662
The Wilkes-Barre roundhouse off of Scott Street. 9 stalls and another 9 tracks outside.
The Jersey City Terminal area is getting its ground cover.
The Jersey City dumper yard in the foreground is getting its ground cover and a healthy covering of loose coal.
The water on the ferry slip side of the Jersey City Terminal has been installed and painted. The ferry slips and a ferry will be added at a later date.

previous  Index page 1 2  next
Click on a picture to enlarge it.

Thursday, March 4, 2021
Generated by Galerie